Open Search Partner with DCC

SMETS1 Consultation: FOC (BG); Unenrolled L&G meters not included in FOC (BG) or FOC (NP) cohorts; SMETS1 TMAD; DMCT and MDUST

DCC is consulting on a range of SMETS1 topics and is seeking feedback from SEC Parties on those proposals.

This consultation covers:

  1. Closure of the FOC (BG) cohort and presents a Draft Decommissioning Timetable.
  2. Unenrolled L&G meters not included in FOC (BG) or FOC (NP) cohort.
  3. An extension of the TMAD expiry date to allow for continued enrolment of the MOC (Secure) cohort.
  4. Closing the MDUST service for the FOC (BG) cohort and curtailing the DMCT service.

Further detail on these proposals can be found in the consultation document and Parties are invited to respond to each of the proposals using the consultation response template.

This consultation closes 5pm on 8 October 2024 and responses should be sent to consultations@smartdcc.co.uk

11/09/24: DCC have identified a minor typo in section 20.2 of the SMETS1 SVTAD redline txt. This has now been corrected with a revised version.