Open Consultations

Details of the consultations which are currently open. 

DCC consultation on TMAD for MOC (MDS SMETS1 SMSO)

A consultation on the changes required to the Transition Migration Approach Document (TMAD) to enable the migration of the SMETS1 devices operated by Morrisons Data Services (MDS) SMETS1 Smart Metering Service Operator (SMSO).

Closes:
06/09/2019
SMETS1 Consultation: Alignment of Migration Testing and System Integration Testing

DCC is consulting on changes to the SEC Variation Testing Approach Document for SMETS1 Services (SMETS1 SVTAD) and the Migration Testing Approach Document for SMETS1 Services ('MTAD'). These changes relate to all forthcoming Capability Releases to provide alignment of System Integration Testing and

Closes:
06/09/2019
DCC consultation on changes to the SEC Variation Test Approach Document (SVTAD) and the MTAD (Migration Test Approach Document) to support testing of Device Model Combinations (DMCs)

This consultation sets out DCC’s proposal on how we will undertake testing to enable additional Device Model Combination (DMC) to be added to the SMETS1 list of Eligible Product Combinations.

Closes:
28/08/2019