Systems Integration Testing - SIT1 functionality

Friday 26 June - Friday 3 July 2015

DCC consulted on the proposed annex to the Systems Integration Testing (SIT) Approach document which sets out the functionality to be tested in the first release into SIT.

The SIT1 functionality annex was approved by the Smart Energy Code Panel on 24 July 2015 and the updated Systems Integration Testing (SIT) Approach document v3.0 was published on the same day. All documents relating to the SIT1 functionality annex is set out below.

Consultation Cover letter

Proposed SIT1 functionality annex

SIT1 consultation response from UKPN (30 June 2015)

SIT1 consultation response from ENWL (29 June 2015)

SIT1 functionality letter - request for SEC Panel approval (7 July 2015)

SIT1 functionality letter - updated request for SEC Panel approval (15 July 2015)

SIT2 functionality consultation August 2015