Closed Consultations

Browse our archive of closed consultations.

SMKI Recovery Procedure

A consultation on those aspects of the Smart Metering Key Infrastructure (SMKI) which relate to the SMKI Recovery Procedure, in accordance with the provisions of Section L10 of the Smart Energy Code (SEC). Consultation closing date 29 July 2015.

Closed:
29/07/2015
Systems Integration Testing - SIT1 functionality

DCC published a short consultation on the proposed annex to the SIT Approach Document which will set out the functionality to be tested in the first phase of Systems Integration Testing. Consultation closing date 3 July 2015.

Closed:
03/07/2015
Enduring Testing Approach Document

The Enduring Testing Approach Document (ETAD) is a Smart Energy Code Subsidiary Document which describes the manner in which DCC will provide Testing Services on an enduring basis i.e. following the closure of the End-to-End Testing Stage. Consultation closing date 3 July 2015.

Closed:
03/07/2015
SMKI Interface Specifications and Codes of Connection

SMKI documents concerning the SMKI Interface Design and Repository Interface Design Specifications and Codes of Connection for second consultation. Consultation closing date 26 June 2015.

Closed:
26/06/2015
SMKI and Repository Test Scenarios

The SMKI and Repository Test Scenarios Document (SRTSD) sets out the tests that a Party or RDP must undertake before they may apply to become an Authorised Subscriber for the purposes of the Device Certificate Policy or the Organisation Certificate Policy (or both) or access the SMKI Repository.

Closed:
22/06/2015
SMKI Registration Authority Policies and Procedures (RAPP) Second Consultation

The SMKI Registration Authority Policies and Procedures (RAPP), which is part of the SMKI Document Set, sets out the procedures in respect of nomination, authorisation and verification of organisations and individuals in order to access SMKI Services and SMKI Repository Services.

Closed:
19/06/2015
DCC Development Plan

DCC consultation on a draft version of the update to the DCC Development Plan, covering the five-year period starting from the Regulatory Year 2015-16. Consultation closing date 15 June 2015.

Closed:
15/06/2015
DCC Gateway Connection Code of Connection - reporting requirements

The DCC Gateway Connection Code of Connection (CoCo) details the principal rights and obligations applying to the provision of DCC Gateway Connections. Consultation closing date 11 June 2015.

Closed:
11/06/2015
End-to-End Testing Approach Document

The End-to-End Testing Approach Document details the testing which can be conducted during the End-to-End Testing Stage. Consultation closing date 5 June 2015.

Closed:
05/06/2015
Common Test Scenarios

The Common Test Scenarios Document (CTSD) translates the provisions set out in the Smart Energy Code (SEC) into tests which measure the ability of relevant Parties to act as DCC Users and interoperate with the DCC. Consultation closing date 29 May 2015.

Closed:
29/05/2015