DCC responses

Here we publish our response to consultations carried out by other organisations. Our responses reflect the views of Smart DCC Ltd and our Service Providers. 

Search Filters

DCC consulted in November 2017 on the proposed SEC Variation Testing Approach Document (SVTAD) for SMETS 1 Services. Following this consultation and upon stakeholder request, DCC has developed a regulatory version of the SVTAD which sets out the rights and obligations of those who provide and use SMETS1 Services. The material changes which have been made to the SVTAD are highlighted in the consultation document.
Type:
Version:
Published date: 11 April 2018
Effective date: 11 April 2018
DCC has today published its conclusions following consultation with stakeholders on amendments to two SEC subsidiary documents in preparation for their designation into the SEC.
Type:
Version:
Published date: 23 June 2016
Effective date: N/A
On 29 March DCC consulted with Parties on the physical dimensions of Dual Band Communications Hubs (DBCH). Following consideration of responses received to this consultation, and analysis of the economic impact of the proposed DBCH Sizing Options, DCC has reached its conclusions which are presented in this conclusions document.
Type:
Version:
Published date: 6 June 2016
Effective date: 6 June 2016
DCC has published its conclusions on the changes to the DCC User Interface Specification and Message Mapping Catalogue.
Type:
Version:
Published date: 27 May 2016
Effective date: N/A
The SMKI Recovery Procedure sets out the procedures in the event of a Compromise or suspected Compromise of different parts of the SMKI. In April 2016 DCC consulted on minor changes to the SMKI Recovery Procedure.
Type:
Version:
Published date: 26 May 2016
Effective date: N/A